Most rental quotes start with the wall and work backwards to a processor. The size that actually survives the job is set by something smaller and less negotiable: the pixel budget of one Ethernet port.

Take the BRC3.91. It is a 500 x 1000 x 65 mm outdoor rental cabinet, 128 x 256 pixels, so 32,768 pixels per box, on a 3.91 mm pitch. Four 250 x 250 mm modules per cabinet, 1/16 scan, 7,680 Hz refresh, IP65, rear service, 13 kg. The full sheet is on the product page here: https://www.mlxled.com/product/brc3-91-7680hz-high-refresh-rate-waterproof-outdoor-rental-led-display-screen-p3-91-led-video-wall-panel/

Now the number that never appears on a rental datasheet. A Gigabit output port on a Novastar-class processor carries roughly 650,000 pixels. That is the ceiling, and it is not negotiable with a bigger power supply or a longer cable.

Do the division. 650,000 divided by 32,768 is 19.8, so nineteen cabinets per port with nothing left over. Nobody runs a port at 100 percent. Twenty percent headroom is the working rule, because the last fifth is where you get dropped frames at 21:00 that never appeared in the workshop. At 80 percent you have 520,000 pixels, which is fifteen cabinets.

Fifteen cabinets of 500 x 1000 mm is 2.5 metres wide and 3 metres high. Seven and a half square metres. That is the real size of one port at P3.91, and it is smaller than most people guess.

The area version is easier to carry around in your head. 32,768 pixels over half a square metre is 65,536 pixels per square metre. Divide 650,000 by that and you get 9.9 square metres per port at full load, or 7.9 square metres with headroom. At this pitch, one port buys you about eight square metres, and it does not matter whether you build it from squares or from half-metre rectangles.

From there the whole quote falls out. A 6 x 3 metre wall is twelve cabinets across and three high, thirty-six cabinets, 1.18 million pixels. Two ports at full load, three with headroom. One six-port processor is comfortable and you still have outputs for a confidence monitor and a side screen.

A 12 x 5 metre wall is twenty-four across and five high. A hundred and twenty cabinets, 3.93 million pixels, six ports at full load and eight with headroom. That is not one processor any more. It is two, or one chassis with more outputs than the rental house usually stocks.

That second processor is where the money and the crew go, and it is never in the wall quote. You need another circuit, because a second processor means another 16 A feed and usually another distro tail. You need another flight case slot in a truck that is already packed. You need a second operator position, or one person running between two laptops while the show is live. And you need the two halves to be frame-locked, which is a mapping job that has to be done in the venue, not in the office.

Two more things worth separating while you are doing this arithmetic.

The first is refresh. 7,680 Hz is a camera number, not a port number. Port load is set by frame pixels multiplied by frame rate, so choosing a 7,680 Hz cabinet does not shrink the wall a given processor can drive. What it buys is a stage that survives phone cameras and broadcast without scan bands crawling across the picture, which is most of what a client judges in the first ten seconds of a clip.

The second is cabinet format. A 500 x 1000 cabinet halves the box count for the same wall compared with 500 x 500: thirty-six locks instead of seventy-two on that 6 x 3, half the in and out connectors, half the spare-parts lines to keep on the shelf. You pay for it in handling. Thirteen kilos per cabinet, and the height comes in one-metre steps, so a 3.5 metre trim forces you to the next row of cabinets you did not want.

Rear service matters more here than it sounds. Every module comes out from behind, so the wall needs a walkway and you should decide that before the truss goes up, not after the client asks for a wider stage.

None of this argues against big walls. It argues for doing the division before the client picks a size. A 12 x 5 metre wall is a perfectly normal ask, and it is also a two-processor job whether or not the quote says so. Knowing that on the first call is the difference between a margin and a favour.

I work with MuenLED (#MuenLED), and the spec sheets are the easy part. The port arithmetic is what people skip.

So, when you price a wall: do you start from the processor already in the truck and let it cap the size, or do you let the client pick the metres and then buy whatever processor fits?