For thousands of years Egypt's harvest depended on the annual Nile flood, so Egyptians built nilometers: stone columns, staircases and river-fed wells marked in cubits. The staircase on Elephantine Island at Aswan saw the flood first, so readings could be sent downstream ahead of the water. The flood height was used to set the year's taxes. The Roda Island nilometer in Cairo (first built 715, rebuilt 861) still stands, and records for 622–999 suggest about one flood in four fell short.

For builders: design around the reading that decides

  • Identify the one measurement that drives every downstream decision, and instrument that first.
  • Capture upstream (intake, first process step), not in the end-of-month report.
  • Bind plans and thresholds to measured values, not to last period's budget.
  • Keep long, honest history; "one bad year in four" only appears in long series.
  • Give the people doing the work the same view as the people judging it.
  • When the system changes (the Aswan High Dam ended the flood in 1970), revisit what you measure.

Full story (with sources): https://isaacmuthui.com/stories/roda-nilometer-flood/