
U.S.-based AI data center developer Giga Energy has signed a 10-year, USD 1 billion lease with an unnamed AI cloud provider for Project Clay, a 60 MW GigaBase AI data center campus in Hunt County, Texas.
Giga broke ground on the project in July and will develop, own, and operate the campus, which the customer will use for AI computing capacity. The site is slated to be ready for service in spring 2027.
*GigaBase Targets Faster Data Center Deployment
*
Alongside the lease announcement, Giga officially unveiled GigaBase, its data center system engineered to tackle lengthy construction timelines, heavy water consumption, and strain on local utilities.
As part of its expansion into Data Center Projects in the US, the company says Project Clay will be completed in under eight months, less than half the time of traditional builds.
Power Strategy Taps Underutilized Capacity
A cornerstone of the project is an investment in new electrical infrastructure that draws on underutilized capacity from dedicated power infrastructure in the county.
The design ensures the campus does not pull from distribution capacity serving existing homes and businesses.
Giga positioned the project against the priorities laid out by Texas Governor-elect Gina Hinojosa, who has called for data centers to pay for their own power, deploy water-efficient cooling technologies, prevent infrastructure costs from shifting onto residents, and ensure communities benefit from growth.
This is exactly the kind of AI infrastructure Texas needs," said Brent Whitehead, president and co-founder at Giga Energy.
"Communities shouldn't have to choose between economic growth and protecting local resources. We've engineered our GigaBase system and development approach so they don't have to."
Cooling System Runs Independently of Local Water
Project Clay replaces open-loop evaporative cooling with a fully closed-loop system that operates independently of local water supplies, whether municipal or groundwater, to cool its IT equipment.
According to the company, the facility consumes no water for compute operations.
The only local water use will come from sinks and employee bathrooms, comparable to a small business office and on par with the annual usage of two homes. Giga frames this approach as aligning with Texas' growing emphasis on water-efficient data center development in drought-prone regions.
Jobs and Tax Revenue Head to Hunt County
The roughly 30-acre campus will serve hyperscale and AI cloud customers while, according to Giga, generating lasting economic value for the county.
The build phase is expected to create approximately 300 construction jobs, with 24 permanent full-time positions carrying estimated annual salaries of USD 116,000 to USD 180,000.
The project is also projected to generate millions in new recurring annual tax revenue that the company says can help fund local schools, infrastructure, emergency services, and other essential public needs.
"We believe AI infrastructure should leave a community stronger than it found it. That means creating high-paying jobs, expanding the local tax base, and making long-term investments that benefit residents for decades," said Whitehead.
"Hunt County is gaining an economic engine that will support schools, public services, and future growth for generations."
*Off-Site Manufacturing Drives the Schedule
*
At the heart of the GigaBase system is a factory-first construction model in which much of the facility is manufactured off-site before final assembly in the community.
Giga says this approach significantly shortens construction schedules, reduces truck traffic, minimizes disruption to local roads and housing, and allows communities to realize economic benefits sooner.
The company describes the resulting campus as faster to build, lighter on local infrastructure, and purpose-built to be a long-term community partner.
Giga has previously promoted the concept under the banner "shovel-ready to rack-ready in 9 months" when introducing the GigaBase system.
Company Background and the Deal's Significance
Giga Energy is a U.S.-based manufacturer, developer, and operator of modular AI data centers, actively contributing to the growth of data center projects and infrastructure development in the US.
The company operates factories in Long Beach and Houston, has delivered more than 7 GW of electrical infrastructure, and has more than 258.5 MW of critical IT capacity completed and under development.
The 10-year, USD 1 billion lease represents a significant commercial milestone for the young company as it scales its modular approach. The customer, an AI cloud provider, has not been publicly named.
With demand for AI infrastructure accelerating across the United States, Giga leaders say the next generation of data centers must do more than power technology and must also earn the trust of the communities where they are built.
The company frames Project Clay as that philosophy in practice, pairing large-scale computing capacity with measures intended to avoid burdening existing residents and utilities.

