Transformers are rated in kVA. Load lists are usually written in kW. The conversion between them is one division:
kVA = kW / PF The mistake is skipping it: reading "58 kW" off a load schedule, seeing "75 kVA" on a transformer quote, and deciding there's plenty of room. Here's a short script that sizes four example loads both ways, the wrong way (treating kW as kVA) and the right way, against a list of common three-phase transformer ratings, keeping loading at or below 80%.
STANDARD_KVA = [15, 30, 45, 75, 112.5, 150, 225, 300, 500, 750, 1000] def kw_to_kva(kw, pf): """Apparent power from real power: kVA = kW / PF.""" assert 0 < pf <= 1, "power factor is a decimal between 0 and 1" return kw / pf def pick_transformer(load_kva, max_loading=0.80): """Smallest standard three-phase size that keeps loading at or below max_loading.""" for size in STANDARD_KVA: if load_kva <= size * max_loading: return size raise ValueError("load too large for this list") loads = [("office", 40, 0.95), ("workshop", 62, 0.85), ("pump station", 90, 0.80), ("compressor room", 58, 0.78)] print(f"{'load':15s} {'kW':>4s} {'PF':>5s} {'kVA':>6s} {'kW-sized':>13s} {'kVA-sized':>13s}") for name, kw, pf in loads: kva = kw_to_kva(kw, pf) wrong = pick_transformer(kw) # treating kW as if it were kVA right = pick_transformer(kva) print(f"{name:15s} {kw:4d} {pf:5.2f} {kva:6.1f} " f"{wrong:>6} @{kva / wrong:4.0%} {right:>6} @{kva / right:4.0%}") Output:
load kW PF kVA kW-sized kVA-sized office 40 0.95 42.1 75 @ 56% 75 @ 56% workshop 62 0.85 72.9 112.5 @ 65% 112.5 @ 65% pump station 90 0.80 112.5 112.5 @100% 150 @ 75% compressor room 58 0.78 74.4 75 @ 99% 112.5 @ 66% What the table says
Two of four loads don't care. The office (PF 0.95) and the workshop (PF 0.85) land on the same transformer either way. That's why the shortcut survives: most of the time it gives the right answer by accident.
The pump station is the classic trap. 90 kW on a 112.5 kVA unit looks like 80% loading, right at the limit. But at PF 0.80 the load is 112.5 kVA, so the transformer is at 100% before anything else gets added. Sized on kVA, the script picks 150 kVA and 75% loading.
The compressor room is worse. 58 kW fits under 80% of 75 kVA (60 kW), so the kW-based pick is 75 kVA. The real load at PF 0.78 is 74.4 kVA: 99% of the nameplate, with zero headroom for motor starting or growth. The kVA-based pick is 112.5 kVA at 66%.
The pattern: the lower the power factor, the bigger the gap between kW and kVA, and the more likely the shortcut puts you one size too small. At PF 0.80 the kVA is 25% higher than the kW. At 0.95 it's only about 5% higher.
Quick rule
Convert to kVA before you compare against any transformer, generator or UPS rating, and use a power factor that matches the actual load (motors and compressors are usually well below 1.0). Then apply your loading margin to the kVA, not to the kW.
Two cautions: the 80% limit here is a design choice, not a code requirement, and the size list is a common set of three-phase ratings, so check the manufacturer's actual range. Nonlinear loads and motor starting need their own checks on top of this.
Your turn: what power factor do you assume for a mixed building load when you don't have measurements yet? 0.8, 0.85, 0.9? Tell me why in the comments.