AI & ML
Battery Energy Storage Sizing in PV Ramp-Rate Smoothing using Constraint-Aware Reinforcement Learning-Based Controller
arXiv cs.SY0 views
arXiv:2611.17612v1 Announce Type: new Abstract: This paper presents a constraint-aware reinforcement learning (CARL) controller for battery energy storage system (BESS) sizing and photovoltaic (PV) ramp-rate smoothing. Rapid PV power fluctuations caused by cloud transitions can introduce operational and stability challenges in power systems. To mitigate these impacts, grid codes impose ramp-rate limits (RRL) on PV power injected to the grid. BESSs can support such grid codes by absorbing or supplying power during rapid variations. However, the extent to which BESSs can reduce PV-induced variability depends on (i) the BESS power and energy capacities; and (ii) the adopted controller. Thus, BESS sizing and controller design are coupled. Conventional moving-average control can increase battery usage due to filter-induced lag, while ramp-rate control is reactive and does not account for the long-term impact of actions on battery state of charge and future ramp events. Optimization-based methods can reduce BESS requirements by anticipating future PV variations, but their performance depends on accurate PV forecasts. To address these limitations, the CARL controller learns a causal state-feedback policy from historical PV data without requiring forecasts during deployment. Ramp-rate, converter-power, and state-of-charge constraints are incorporated into a causal feasibility interval that guarantees feasible actions by definition. A full-horizon input-convex neural network (ICNN)-based optimization is developed as a noncausal benchmark for the minimum achievable BESS requirements. Evaluation using three real-world PV datasets shows that, at a 10\%/min ramp-rate limit, CARL reduces peak BESS power by 8.7--10.4\% and energy capacity by 47.5--62.6\% relative to conventional ramp-rate control while maintaining the grid-codes compliance.
Source:https://arxiv.org/abs/2611.17612PreviousSub-Synchronous Control Interaction Risk of Large Data Center Loads: A Frequency-Scan Assessment with Cross-Model ValidationNextFeasibility of Pareto-Improving Damping Control of Forced Oscillations: The Active-Power Case
Related posts
An LLM confidence score isn’t correctness: the certainty trap
0dev.to
What a host-side layer for LLM agents is, in plain words (and what it is not)
0dev.to
OpenAI's Agents API Lets Any App Rent Codex, Here's How It Works
0dev.to

94% of Singapore Small Business Owners Surveyed Say More AI Guidance Is Needed
0Meta Newsroom
Nashville, Tennessee Real Estate Dataset: 7,436 Listings, Excel File (Nov 10, 2026)
0dev.to Data
A Hundred and Eighty Six Thousand Pounds of Stock Had Left One Branch and Never Arrived at Another
0dev.to Data