Earthing calculations have a reputation for being black magic, mostly because most sheets give you one number with no derivation. The underlying formulas are old, published and checkable. Here are the three calculations every electrical design engineer runs, with worked numbers.

1. Single earth rod resistance

For one vertical rod, the standard Sverak/Dwight formula:

R = (rho / 2 pi L) x (ln(8L / d) - 1) 
  • rho = soil resistivity in ohm-meters (from the soil test, not a guess)
  • L = rod length, d = rod diameter

Example: rho = 100 ohm-m, rod 3 m long, 16 mm diameter:

R = 100 / (2 pi x 3) x (ln(8 x 3 / 0.016) - 1) = 5.305 x (ln(1500) - 1) = 5.305 x 6.31 = 33.5 ohm 

One rod does not get you to 10 ohm in average soil. That is normal and it is why we use several.

2. Rods in parallel: the utilization factor

Rods in parallel do not divide cleanly because their resistance areas overlap. The rule of practice:

R_group = R_single / n / eta 

where eta is the utilization factor, typically 0.7-0.85 depending on spacing relative to rod length. Four of the rods above, spaced about one rod length apart (eta = 0.8):

R_group = 33.5 / 4 / 0.8 = 10.5 ohm 

Six rods, or wider spacing, gets you under 10. The honest takeaway: the utilization factor is a typical figure - your soil test and your layout decide it. Any sheet that does not show it is hiding it.

3. Earth conductor sizing: the adiabatic equation

S = I x sqrt(t) / k 
  • I = fault current in amps, t = clearing time in seconds
  • k = material factor from the standard tables, by conductor material and insulation (copper with PVC insulation: k = 115)

Example: 10 kA earth fault cleared in 1 s, copper PVC-insulated conductor:

S = 10000 x 1 / 115 = 87 mm2 -> next standard size up: 95 mm2 

Check against the code minimum for your installation type and never size below it.

4. Lightning screening: expected strike frequency Nd

Before any lightning protection design, you estimate how often the structure is likely to be struck:

Nd = Ng x Ad x C1 x 10^-6 
  • Ng = ground flash density per km2 per year. If you only know thunderstorm days: Ng = 0.1 x Td
  • Ad = equivalent collection area of the structure: Ad = L x W + 6H(L + W) + 9 pi H^2
  • C1 = location factor (0.5 surrounded by taller structures, 1 isolated, 2 on a hilltop)

Example: Td = 20 (Ng = 2), building 40 x 20 m, 10 m high, surrounded by taller structures (C1 = 0.5):

Ad = 40 x 20 + 6 x 10 x 60 + 9 pi x 100 = 800 + 3600 + 2827 = 7227 m2 Nd = 2 x 7227 x 0.5 x 10^-6 = 0.0072 strikes/year 

One strike per 138 years. Compare that against the tolerable frequency in your risk assessment. And note what this is: a screening. A full IEC 62305-2 risk assessment is required for the final design - any tool that tells you "protection not required" from this number alone is wrong.

A sheet that shows all of this

I got tired of black-box earthing sheets, so I built the one I use: rod and grid resistance with the utilization factor shown, conductor sizing with the k table visible and the next standard size picked, lightning screening with collection area and source columns, and a 13-item design checklist (soil test, step and touch voltage, GPR, bonding, SPD coordination) with Pending/Done status. Every result row carries its formula, its source and its verification status - and every source ships marked "Not verified" so you confirm each clause against your edition before issue.

It is $34 here: Earthing & Lightning Protection Calculation Sheet

My other field tools (NFPA 72 battery sizing, fire alarm BOQ, CAD symbol library) are on the same store: firealarmcad.gumroad.com

Questions and corrections welcome in the comments.