When a game studio adds an outstaffed developer from India to its own team, the first week decides a lot. If they spend it waiting for VPN access, fighting a build that only works on one senior engineer's laptop, or guessing which branch to work from, the arrangement starts on the back foot, and that has nothing to do with the developer's skill.

This is a practical checklist for the engineering side of that first week. It assumes the developer works inside your repo, your tools and your sprint, rather than delivering a separate package. It's engine-agnostic, and it doesn't rely on any particular vendor.

Before day one

  • Accounts ready, not requested. Source control, issue tracker, chat, CI dashboard, crash reporting and any asset storage should be set up before they start. Give individual accounts with the narrowest access that works. No shared logins.
  • Hardware and licences confirmed. Check the engine version, IDE, platform SDKs and any paid plugins they need, and who provides each licence. If they'll need a console dev kit or a specific test phone, sort that out now, because those have lead times.
  • Network path tested. If your repo or build cache sits behind a VPN, have someone outside the office test the full clone and first build over it. Large repos with LFS or Perforce depots can take hours over a long-distance link, so a pre-seeded workspace or a nearer cache server may save a day.

Day one: build from a clean machine

The single best test of your onboarding docs is a new person following them. Ask the developer to set up from scratch using only the README, and to write down every step that was missing or wrong. Then fix the README that day. You get a better doc and they get a working build.

Things that commonly break here:

  • Undocumented environment variables or local config files
  • A required tool version that's "whatever I had installed"
  • Generated files that are expected to exist but aren't in the repo
  • Shader or asset caches that take a long time on first import with no warning

Days two and three: the workflow rules

Write these down somewhere they can find them, even if they feel obvious to the existing team:

  • Branching: where feature work starts, naming conventions, and how often to rebase or merge from main.
  • Commit and PR size: what a reviewable change looks like on this project.
  • Review turnaround: who reviews their PRs, and the expected turnaround. Across a 5.5-hour (UK winter) or 10.5-hour (US Eastern) gap, a review that waits for "tomorrow" can easily cost two working days.
  • Definition of done: builds on CI, tested in-engine, no new warnings, ticket updated, a short note for QA.
  • Binary assets: who can edit scenes, prefabs or levels, and how locks work, so two people don't both edit the same map.

Days three to five: a real first ticket

Pick a first task that touches the real codebase but is small and well-defined: a bug with a clear repro, a small UI change, or a tool improvement. Avoid "read the code and get familiar" as a task. It produces nothing to review and tells you very little.

Pair once or twice during the overlap window. A 30-minute screen share on their first PR does more than a long written review.

Make the overlap hours count

India Standard Time doesn't shift for daylight saving, so the overlap changes when the UK or US clocks change. Agree a fixed daily overlap window, keep stand-ups and reviews inside it, and use the rest of the day for focused work. Ask the developer to post a short end-of-day note: what's done, what's blocked, what they'll pick up next. Your team reads it in their morning and can unblock before the next overlap.

End of week one: a quick retro

Ask three questions: what slowed you down, what was unclear, and what would you change for the next person. Feed the answers back into the README and the onboarding list. The next developer you bring in, outstaffed or in-house, gets an easier first week.

If you're weighing up adding outstaffed engineers, artists or designers to your own team, Juego Studios offers game outsourcing and outstaffing services from India. And if you're still deciding between hiring individual specialists or a dedicated pod for a track that's behind, we wrote about how to choose between specialists and a pod on LinkedIn.