In AI Risk is evolving, every day., David Hunt and I examined how an AI agent can pursue a legitimate objective through methods outside its mandate. Oversight needs to connect organisational intent, knowledge, authority, actions and consequences.
This article summarises the full paper. To supervise that agent, we need to specify its responsibilities, the concepts it uses, the evidence its work requires and the actions it may take.
Start with an organisational role
“Planning agent” tells us what an agent does, but leaves its responsibility unclear.
A Product Manager breaks outcomes into features and acceptance criteria. A Project Manager turns agreed scope into a delivery plan with dependencies, owners and milestones. Both perform planning, but their work products and authority differ.
An agent's planning capability should belong to a defined organisational role. Its implementation provides services that use tools to perform specific actions.
The chain becomes:
Organisation → role → capability → service → tool → action → contextual permission.
A Project Manager agent might select an approved planning template and create a draft in its assigned project. That assignment does not authorise production deployment. The permission decision must govern the actual tool operation, including alternative routes through shells or delegated agents.
Give the role a defined conceptual space
Each role needs a governed view of organisational knowledge. A Product Manager works with user needs, value hypotheses and acceptance criteria. A Project Manager needs dependencies, resources, risks and delivery commitments. Shared concepts connect their work without making the roles interchangeable.
Figure 1. Proposed role contract: the knowledge needed to plan and the authority to act are explicit.
Terraphim's role-based knowledge graphs make this vocabulary explicit through concepts and synonyms. The inspected indexer connects consecutive recognised concepts in document text, retaining supporting document references. Those associations help retrieve relevant notes and explain why they were selected.
The next layer is to type the relationships. A connection might mean “depends on”, “addresses a requirement” or “requires approval”. The role selects the applicable relationship profile from approved templates, traced to adopted standards or documented organisational extensions.
A sentence mentioning a release, a manager and approval does not establish that approval occurred. “Requires approval” and “was approved” are different claims.
Verify meaning in its context
A checklist can recognise every expected concept while missing a change in meaning.
Suppose a delivery plan must place a rollback rehearsal in staging, with its planned start within eight elapsed hours of a defined failure trigger. An output can contain “rollback”, “rehearsal” and “hours” while moving the activity to production or replacing elapsed hours with business days.
Successful checking therefore requires compatible concepts, relationships and context across the input, output and criteria. Different terminology can be acceptable through an explicit mapping. Changed scope, units, conditions or prohibitions cannot pass silently.
Our paper uses ISO/IEC/IEEE 42010:2022 to frame architecture descriptions and ISO/IEC/IEEE 29148:2018 to distinguish requirements quality and stakeholder intent from evidence about the realised system. This is a standards-informed design, not a conformity claim.
The practical requirement is traceability: identify the requirement version, relevant context, applicable criterion and evidence behind each result. When those conditions change, reassess the affected findings. Unknown context should produce an indeterminate result, not an assumed pass.
Figure 2. Proposed contextual check: passing a planning criterion neither proves the rehearsal occurred nor grants deployment authority.
Make the audit concrete
Terraph, the Terraphim language, connects a role graph, a checklist and a gated action in one program. The graph and checklist compile from Markdown into constant matching automata. embed identifies concepts and source spans; text satisfies preflight reports which checklist items are missing.
The deploy verb declares the evidence it needs. Here, engineer is the example role; it does not change the Project Manager’s authority:
import std; role engineer from "kg"; checklist preflight from "checklists/preflight.md"; fn deploy(plan: str, ev: Proof<preflight>) -> i64 { print("deploy: preflight evidence present, proceeding"); return 0; } The generated verb wrapper obtains a sealed Proof<preflight> through .require() only when no checklist items are missing. The proof binds to the checked snapshot, available as ev.subject.
Figure 3. The Terraph proof gate. The example body prints a message; it does not deploy a system.
Any actual operation must use that checked snapshot and pass a separate authority check. Reopening the plan could read changed bytes. Passing the checklist cannot give a Project Manager production privileges, nor can concept coverage establish that the plan is correct.
Our earlier argument calls for supervision that follows an agent's changing context. An inspectable role contract gives that supervision a defined mandate to check. A Project Manager agent can prepare a plan, preserve its requirements and record the evidence, while release authority stays with the role responsible for exercising it.
Originally published at reference-architecture.ai.