AI & ML
Budgeted Subset Selection with a Transferable Learned Value Model
arXiv stat.ML0 views
arXiv:2611.27751v1 Announce Type: new Abstract: Subset selection is a fundamental task in machine learning, statistics and combinatorial optimisation, with applications in active learning, band selection, input selection and experimental design. The utility of a subset depends on information revealed only after the selection, such as labels or responses, and on interactions among selected candidates. Existing approaches combine value estimation and redundancy control in application-specific ways, which limits their use in other domains. This paper introduces Subset Acquisition with Learned Value Estimates and Search (SALVES), a framework that decomposes subset selection into two components. First, a value model is trained by supervised learning on tasks where the hidden information is known. On a new task, it predicts the utility each candidate would add to the current selection. Second, a selection step chooses the subset from these predictions, typically by simulated annealing with a diversity term penalising redundancy. The value model transfers to new classes, pretrained networks, datasets and sensors, and from synthetic to real data. On the four applications, SALVES matches or outperforms application-specific baselines on average. It requires substantially fewer bands for equal accuracy and remains reliable in input selection where individual baselines fail.
Source:https://arxiv.org/abs/2611.27751PreviousCan pretrained Transformers deliver semiparametrically efficient inference?NextCommunication-Efficient Federated Learning of Latent Patient Representations from Multi-Institutional EHRs
Related posts
A Practical Workflow for Agent-Driven 3D Asset Generation
0dev.to

Hermes: reminders that carry the check
0dev.to
Bessel-Debiased Pseudo-Marginal MCMC for Generalised Bayesian Inference
0arXiv stat.CO
Revisiting Generalized Median Estimators: Exact Bitwise Computation and Gray Code Acceleration
0arXiv stat.CO
Exact Online $Q_n$ Estimation: Exploiting Sliding-Window Rank Invariance
0arXiv stat.CO
ISC Stormcast For Monday, November 23rd, 2026 https://isc.sans.edu/podcastdetail/10190, (Mon, Nov 23rd)
0SANS ISC