Backend
Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines
arXiv cs.SY0 views
arXiv:2611.25223v1 Announce Type: new Abstract: Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.
Source:https://arxiv.org/abs/2611.25223PreviousReliability-based Sizing of Energy Storage for Large Load IntegrationNextData-driven Linearization of Operational Dynamics of Soft Open Points in Power Distribution Networks
Related posts

@Data on a JPA Entity Gave Us a False `equals()` and 18,000 Duplicate Rows
0dev.to
How we keep AI chatbots inside Safari on a teen's iPhone (without a VPN or MDM)
0dev.to
n8n workflow #2: a push notification when the ISS flies over my town
0dev.to
Replaying Yesterday: Designing a Date Picker for a Daily Puzzle
0dev.to
A refusal that changes no bytes
0dev.to
NestJS for Spring Boot developers: a TypeScript backend that will feel familiar
0dev.to